Rain night fighting!"Anman Blue" sticks up 24 hours a day

—— A jet grouting drilling rig on the site failed, delayed the normal construction of the use!

 

       When receiving the customer's anxious fault consultation, Anman service sales supervisor immediately sent workers, appointed the area service sales manager Wang Bing immediately launched the maintenance action. Within a minute of receiving the order, Wang called the customer, conducted a simple troubleshooting, then took the accessories and toolbox, and drove out within an hour.

       Arrived at the scene of the drill fault point depth investigation, the problem is not difficult to solve, is the customer construction period can not be delayed.

"Boss, you don't worry, I am here today to help you solve the problem, tomorrow morning to ensure smooth work!"Said he took out a wrench from the toolbox, and Engineer Wang did not hesitate to act . 

 

 

Hammer tap

The clank rang

The sun sank slowly in the shock waves

Rain night comes

 

       The winter rain in this restless night quietly, too late to wipe the sweat, mixed with piercing rain cut off the face, clothes and shoes were also put on a layer of "raincoat". The chaotic raindrops did not disturb Engineer Wang's clear thinking. He still insisted on the maintenance task, quickly and accurately eliminated the fault, to ensure that the customer's construction progress is not affected.

       The two captains at the scene were also driven by Engineer Wang's responsibility and execution, and assisted in the maintenance work on the side. With the concerted efforts of everyone, the maintenance was finally completed at 2 o'clock in the morning. And the whole machine to ensure that the problem is solved successfully.

 

       The next day, the drilling rig was under normal construction. After a simple rest, Engineer Wang returned to the construction site to observe the operation of the drilling rig and the operation of the captain, and provided technical support from time to time.

       Engineer Wang Institute has a solid theoretical foundation and rich field experience, not only reflected in the proficiency of maintenance skills, but also reflected in dealing with various difficult and complex construction types. Through the on-site guidance of Anman service engineers, the construction quality can also improve the construction efficiency. We provide a full set of construction solutions, covering from the construction preparation stage to the construction to the inspection link, and we are committed to providing customers with a full range of services.

 

       Engineer Wang always adheres to the interests of customers as the starting point in his work.

       We should not only pay attention to the performance and quality of the drilling rig, but also always pay attention to the customer needs, construction pain points and satisfaction. By collecting the problems and requirements encountered in the field, feedback to improve and upgrade, so as to provide customers with more accurate and efficient service; collect first-hand rig development information in order to better understand the market dynamics and grasp the demand direction.

       At the same time, Engineer Wang also undertook part of the task of bringing new people.

       In the initial stage of the training, they need to go through a period of 3-6 months. Only by truly mastering the assembly skills, can we better understand the structure and working principle of the drilling rig, so as to be more handy in the later maintenance work."Academic success" new sales "novice", we will arrange experienced Engineer Wang to conduct on-site maintenance training. Through the teaching of practical experience, to help the new sales to better deal with practical problems.

       In this competitive and fast-paced era, the stability and reliability of drilling rigs are the important determinants for customers to choose drilling rig manufacturers. The Anman Drilling Rig is committed to being a must-have option on your shopping list.