Location (province): Guangdong Province |
Location (city): Nanxiong City |
Drilling rig type: HDL-180D1 |
Drill pipe : 146 casing + 76 drill pipe. |
Construction technology: casing + drill pipe double pipe drilling |
Stratigraphic condition: 1~2 meter clay layer, 3~4 sandy cobble layer 5~12 and all weathered red sandstone. |
angle (degree): 90 |
Diameter (mm): 150 |
Depth (m): 11.5 |
Efficiency (H): 0.5 |
Net Drilling time (H): 0.25 |
Net removing tool time (H): 0.15 |
Process information: |
1 Locate the hole position |
2 Drill directly through the clay layer by using two connected sleeves pipe in terms of Water pump not working, then do percussion on the pebble layer. |
3 make water pump work by using drill pipe, and drill hole to 11.5 meters depth by rotary impact power . |
4 remove drill pipe. |
5 Backward drill machine and then use the winch crane to do anchor |
6.Forward Machine, using clamp holds sleeve, lifting push-support, make sleeve up to the position where the sleeve joint and sleeve connection will not interfere with the bolt. Pull out the sleeve with power head. |
The advantages of top drive rigs are: |
1 High efficiency, new machine can make a pile within half an hour |
2 Low energy consumption, high-power air compressor is not needed |
3 Grouting effect is good. The close holes will not mix together afer grouting |
4. Working environment get improvement, workers do not need to suffer in the dust, customers approve the top percussion technology on our drilling machine |